{"id":1757,"date":"2023-12-06T09:21:50","date_gmt":"2023-12-06T07:21:50","guid":{"rendered":"https:\/\/pti.qki.dk\/projekter\/cip-anlaeg-til-kalundborg-forsyning\/"},"modified":"2024-03-26T11:09:40","modified_gmt":"2024-03-26T09:09:40","slug":"cip-anlaeg-til-kalundborg-forsyning","status":"publish","type":"page","link":"https:\/\/pti-as.dk\/en\/projekter\/cip-anlaeg-til-kalundborg-forsyning\/","title":{"rendered":"\u200bCIP Systems"},"content":{"rendered":"<h1>CIP System for Kalundborg Forsyning<\/h1>\n<p>PTI has designed and constructed the CIP system for Denmark&#8217;s largest heat pump plant at Kalundborg Forsyning to date.<\/p>\n<p>The heat exchanger system itself was designed and built by Aktive Energi Anl\u00e6g A\/S. PTI provided consultancy to Aktive Energi Anl\u00e6g in the construction of the piping system and dimensioning of the CIP pipes.<\/p>\n<p>The system is built as a circulation system with a balance tank and circulation pump. PTI was responsible for the local control, which was carried out in collaboration with Uni-El.<\/p>\n<h4><strong>Dimensioning<\/strong><\/h4>\n<p>The system is dimensioned for the task, considering the relatively long operating times expected for each heat exchanger between cleanings.<\/p>\n<p>The heat exchanger part is designed for very large water volumes. During cleaning, this is not a problem, but one of the significant challenges is handling the filling and emptying of the CIP system without having to execute the water supply and drainage system in full scale. For a system of this type, full scale would make the installation costs disproportionally large compared to the savings that could be achieved.<\/p>\n<h4><strong>Design<\/strong><\/h4>\n<p>Based on PTI\u2019s solid expertise in constructing process plants, the system is designed with a compact, logical, and easily understandable layout.<\/p>\n<p>The system is designed as a transportable unit where almost all components are mounted within a defined area.<\/p>\n<p>Aktive Energi Anl\u00e6g chose to purchase valves. The other components were selected in collaboration with Aktive Energi Anl\u00e6g and purchased by PTI.<\/p>\n<h4><strong>Manufacturing\/Assembly<\/strong><\/h4>\n<p>The CIP system was manufactured, prewired, and tested at PTI\u2019s own workshop before being shipped to the heating plant in Kalundborg.<\/p>\n<p>After the system was connected on-site and underwent a brief commissioning, it was delivered fully functional.<\/p>\n<p>Back to Industry and district heating <a href=\"https:\/\/pti-as.dk\/produkter\/varmevekslere-og-rengoeringssystemer-til-industri-og-fjernvarme\/\">click here<\/a><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-648\" src=\"https:\/\/pti-as.dk\/wp-content\/smush-webp\/2024\/01\/20170614_110528-768x1024.jpg.webp\" alt=\"\" width=\"768\" height=\"1024\" srcset=\"https:\/\/pti-as.dk\/wp-content\/smush-webp\/2024\/01\/20170614_110528-768x1024.jpg.webp 768w, https:\/\/pti-as.dk\/wp-content\/smush-webp\/2024\/01\/20170614_110528-225x300.jpg.webp 225w, https:\/\/pti-as.dk\/wp-content\/smush-webp\/2024\/01\/20170614_110528-1152x1536.jpg.webp 1152w, https:\/\/pti-as.dk\/wp-content\/smush-webp\/2024\/01\/20170614_110528-1536x2048.jpg.webp 1536w, https:\/\/pti-as.dk\/wp-content\/smush-webp\/2024\/01\/20170614_110528-1080x1440.jpg.webp 1080w, https:\/\/pti-as.dk\/wp-content\/smush-webp\/2024\/01\/20170614_110528-1280x1707.jpg.webp 1280w, https:\/\/pti-as.dk\/wp-content\/smush-webp\/2024\/01\/20170614_110528-980x1307.jpg.webp 980w, https:\/\/pti-as.dk\/wp-content\/smush-webp\/2024\/01\/20170614_110528-480x640.jpg.webp 480w, https:\/\/pti-as.dk\/wp-content\/smush-webp\/2024\/01\/20170614_110528-scaled.jpg.webp 1920w\" sizes=\"(max-width: 768px) 100vw, 768px\" data-smush-webp-fallback=\"{&quot;src&quot;:&quot;https:\\\/\\\/pti-as.dk\\\/wp-content\\\/uploads\\\/2024\\\/01\\\/20170614_110528-768x1024.jpg&quot;,&quot;srcset&quot;:&quot;https:\\\/\\\/pti-as.dk\\\/wp-content\\\/uploads\\\/2024\\\/01\\\/20170614_110528-768x1024.jpg 768w, https:\\\/\\\/pti-as.dk\\\/wp-content\\\/uploads\\\/2024\\\/01\\\/20170614_110528-225x300.jpg 225w, https:\\\/\\\/pti-as.dk\\\/wp-content\\\/uploads\\\/2024\\\/01\\\/20170614_110528-1152x1536.jpg 1152w, https:\\\/\\\/pti-as.dk\\\/wp-content\\\/uploads\\\/2024\\\/01\\\/20170614_110528-1536x2048.jpg 1536w, https:\\\/\\\/pti-as.dk\\\/wp-content\\\/uploads\\\/2024\\\/01\\\/20170614_110528-1080x1440.jpg 1080w, https:\\\/\\\/pti-as.dk\\\/wp-content\\\/uploads\\\/2024\\\/01\\\/20170614_110528-1280x1707.jpg 1280w, https:\\\/\\\/pti-as.dk\\\/wp-content\\\/uploads\\\/2024\\\/01\\\/20170614_110528-980x1307.jpg 980w, https:\\\/\\\/pti-as.dk\\\/wp-content\\\/uploads\\\/2024\\\/01\\\/20170614_110528-480x640.jpg 480w, https:\\\/\\\/pti-as.dk\\\/wp-content\\\/uploads\\\/2024\\\/01\\\/20170614_110528-scaled.jpg 1920w&quot;}\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>CIP System for Kalundborg Forsyning PTI has designed and constructed the CIP system for Denmark&#8217;s largest heat pump plant at Kalundborg Forsyning to date. The heat exchanger system itself was designed and built by Aktive Energi Anl\u00e6g A\/S. PTI provided consultancy to Aktive Energi Anl\u00e6g in the construction of the piping system and dimensioning of [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":1288,"parent":1656,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"class_list":["post-1757","page","type-page","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/pti-as.dk\/en\/wp-json\/wp\/v2\/pages\/1757","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pti-as.dk\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/pti-as.dk\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/pti-as.dk\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/pti-as.dk\/en\/wp-json\/wp\/v2\/comments?post=1757"}],"version-history":[{"count":0,"href":"https:\/\/pti-as.dk\/en\/wp-json\/wp\/v2\/pages\/1757\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/pti-as.dk\/en\/wp-json\/wp\/v2\/pages\/1656"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pti-as.dk\/en\/wp-json\/wp\/v2\/media\/1288"}],"wp:attachment":[{"href":"https:\/\/pti-as.dk\/en\/wp-json\/wp\/v2\/media?parent=1757"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}